Traffic impact assessments
Three stages: Pre-Application Traffic Note, TIA Scoping Memo, and Full Traffic Impact Assessment. View TIA services
Request a proposalWe provide traffic and transportation engineering for development projects across British Columbia. Every study is prepared and sealed by a Professional Engineer registered with Engineers and Geoscientists BC. Scope and fee are confirmed in writing before work begins.
Three stages: Pre-Application Traffic Note, TIA Scoping Memo, and Full Traffic Impact Assessment. View TIA services
Request a proposalTrip generation, transportation analysis and technical memos for development applications.
Request a proposalLetters and supporting analysis for developments within 800 m of a provincial highway that are referred to the BC Ministry of Transportation and Transit.
Request a proposalDemand analysis, utilization surveys, shared-parking assessments and parking variance support.
Request a proposalLoading demand, bay sizing, swept-path checks and operating rules for municipal review.
Request a proposalInternal movement design, site access reviews and swept-path checks for vehicle, pedestrian and cyclist movement.
Request a proposalPedestrian and cycling network analysis aligned with the B.C. Active Transportation Infrastructure Grants Program.
Request a proposalConstruction-phase traffic management plans for municipal permitting, detour routes and site access phasing.
Request a proposalIndependent review and engineer sealing of traffic management plans prepared by contractors and traffic-control companies, where the municipality requires a Professional Engineer's seal.
Request a proposalSignal warrants, intersection operations, site access reviews, queuing and other technical memos.
Request a proposal