Pre-Application Traffic Note
Delivered in 3–5 business days. Start smart — validate your site's traffic viability before you commit.
A concise 5–7 page pre-application traffic analysis that gives you and your planning consultant a clear picture of site access, trip generation, and likely municipal requirements — before you spend a dollar on full design.
- Site access and intersection geometry assessment
- Trip generation estimates (ITE rates, BC-adjusted)
- Peak-hour traffic conditions summary
- Preliminary parking demand analysis
- Key issues and risks summary
- Recommended next steps and scope estimate
48-Hour TIA Scoping Memo
Delivered in 2 business days. Get a clear TIA scope before you engage a municipality.
A structured scoping memo for planning consultants and developers who need to understand the full TIA requirement — intersection counts, study area, analysis horizons, and deliverable checklist — before issuing an RFP or submitting a development application.
- Development scenario and land use review
- Study area delineation (intersections & corridors)
- Traffic count and data requirements list
- Analysis horizons and background growth assumptions
- Deliverable checklist aligned to municipal guidelines
- Estimated TIA timeline and fee range
Fast-Track TIA
Delivered in 10–14 business days. Full engineer-sealed TIA — submission-ready in two weeks.
A complete Traffic Impact Assessment that meets ICBC, municipal, and Ministry of Transportation & Infrastructure (MoTI) requirements. Engineer-sealed by a BC-licensed P.Eng and delivered submission-ready for your development application.
- Existing conditions analysis (counts, geometry, operations)
- Trip generation and distribution (ITE + local adjustments)
- Future traffic forecasting with background growth
- Signal warrant and intersection operations analysis
- Site access design and queuing assessment
- Parking supply and demand analysis
- Transportation Demand Management (TDM) measures
- Engineer-sealed report, drawings, and summary tables